Prev Post
State Government Approves 8,015 Sq Ft Land on Senapati Bapat Road for Pune Press ClubForest Trails Residents Raise Alarm Over Alleged Illegal Construction on Reserved Land
Residents of Bhugaon's Forest Trails Township have expressed grave concerns about what they see as unlawful construction occurring on property designated as an (NDZ) No-Development Zone.
What the Residents Are Saying
According to the Forest Trails Welfare Association (FTWA), heavy machinery and construction materials have been transported into the area despite clear restrictions on development. The land in question falls under the Bhugaon Development Plan (DP), which designates portions of the area as Forest, Bio-Diversity Park (BDP), or No-Development Zone.
Residents argue that:
- A truckload of red soil was dumped on the NDZ land.
- This activity happened near the Daffodil building within the township.
- The work was halted only after residents confronted the workers.
- FTWA had already filed an official complaint with PMRDA in December 2020 regarding earlier attempts at construction.
Reserved Land Must Not Be Altered
Under the Bhugaon DP, certain open spaces are meant to be preserved as natural buffers, ensuring sustainable development. Residents emphasise that any alteration— even levelling land or dumping soil— can permanently damage the area’s ecology.
The concern is not only environmental. Residents also worry that:
- Unauthorised construction may set a dangerous precedent.
- Builders may later claim that “work has already begun” to justify future permissions.
- PMRDA’s alleged inaction could undermine public trust in planning authorities.
What Paranjape Builders Have Explained
Representatives of Paranjape Schemes have clarified that:
- The land belongs to the builder, but as per the Development Plan, it is officially classified as open land.
- A compound wall has been constructed around the bungalow plots to protect the property.
- The soil-filled area was cleaned solely for maintenance, and no construction has been carried out.
- They claim they have complied with the DP and assert that no development work has violated the law.
PMRDA’s Position
PMRDA officials have stated that:
- They will investigate the issue raised by residents.
- Any construction in the No-Development Zone is strictly prohibited.
- Action will be taken if any violation is confirmed.
However, residents argue that despite multiple complaints over the years, no visible steps have been taken to prevent further attempts at altering the land.
Why This Issue Matters
Bhugaon lies on the outskirts of Pune and is part of a region rich in biodiversity. Illegal hill cutting, soil dumping, and construction have long-term effects such as:
- Soil erosion
- Change in natural drainage patterns
- Loss of green cover
- Increased environmental vulnerability
Residents believe that protecting these buffer zones is essential for the ecological health of Pune’s western corridor.
CM Devendra Fadnavis suspends the ₹750-crore TDR proposal for Janata Vasahat Land in Pune and orders an investigation.
Maharashtra Chief Minister Devendra Fadnavis has ordered an inquiry and suspended the ₹750-crore Transferable Development Rights (TDR) proposal concerning Janata Vasahat land in Pune.
The move follows a complaint by Minister of State Madhuri Misal, pointing out major irregularities in the SRA compensation process. Fadnavis has directed the Additional Chief Secretary of the Housing Department to conduct a probe into the matter in detail.
The SRA had proposed a one-time TDR to a private developer for more than 40 acres of land in exchange for the Janata Vasahat slum. However, there were discrepancies in the valuation: while the proposal estimated the land value at ₹750 crore, its official reassessment pegged it around ₹109 crore.
Officials said that the authorities misused the earlier land records and ready reckoner rates in making the inflated compensation calculation. The court has stayed all the proceedings with regard to the proposal pending an inquiry.
Madhuri Misal, confirming the decision of the Chief Minister, said the action would ensure transparency in the redevelopment process for Janata Vasahat and safeguard public resources.
Maharashtra Govt Rejects Lease Renewal of Jeejeebhoy Trust Land in Mumbai
The Jeejeebhoy Trust's land lease for two plots in the Mazgaon neighbourhood of Mumbai has not been renewed by the Maharashtra government. The state revenue department made the decision in response to anomalies in the lease renewal payment procedure.
According to officials, the trust held leasehold rights over two government-owned plots — one measuring about 725.76 square metres and another approximately 9,154.10 square metres. The renewal payment was allegedly made into government accounts by Ekya Realty Pvt Ltd, a private company, instead of the trust.
Revenue Minister Chandrashekhar Bawankule ordered that the amount deposited irregularly by the trust or the developer be refunded immediately. He stated that if the trust submits a fresh lease renewal application, it will be reviewed as per government policy.
Earlier, a government resolution dated September 24, 2025, had allowed for the refund and permitted renewal, and the refund process is already underway.
Shiv Sena (UBT) MLC Sachin Ahir raised the issue, alleging that certain business entities were attempting to acquire the government land under the pretext of the trust. He demanded that the state take possession of the properties, auction them, and decide on their future development.
Zepto's "10-Minute Land" Offer: A Blend of Real Estate and Fast Commerce
India’s quick-commerce pioneer Zepto has taken its “10-minute delivery” model far beyond groceries — into real estate. The company recently announced a partnership with The House of Abhinandan Lodha (HoABL) to allow users to browse and book plots of land via the Zepto app, promising the entire process can be completed in about ten minutes.
This campaign, launched around Janmashtami, marks a bold step in redefining how fast high-value purchases can happen in India’s digital ecosystem.
How Does the “10-Minute Land” Model Work?
The process is designed to mimic Zepto’s signature delivery experience — but for land:
- Users open the Zepto app and search for “land.”
- Listings from HoABL projects appear, showing plot locations and pricing.
- Interested buyers can reserve their chosen land by paying a token amount online.
Within minutes, confirmation and documentation follow through secure digital channels.
While this doesn’t mean the entire property transaction is completed in ten minutes, the initial booking and reservation process is now lightning-fast — a symbolic nod to Zepto’s identity.
Why Is Zepto Entering Real Estate?
- Brand Expansion Beyond Groceries: Zepto wants to stand out in the rapidly changing quick-commerce market by focusing on high-value, experience-driven industries.
- Appeal to Millennial Investors: Younger consumers are more receptive to digital-first investments, including real estate, because they are accustomed to instant gratification.
- Marketing Innovation: The “10-minute land” tagline has generated massive buzz, aligning Zepto with speed, innovation, and convenience in every sphere.
The Challenge of Fast-Tracking Real Estate
Buying land isn’t as simple as ordering groceries — and that’s where the complexity lies.
- Regulatory obstacles:Title checks, verification, and documentation are necessary for real estate transactions and cannot be omitted.
- Risks to transparency:Traditional procedures are still required for the legal completion process, even though Zepto's platform may manage discovery and token payments.
- Scalability issues: At the moment, this service is only available for a few HoABL projects in areas like Vrindavan and Neral; the viability of extending to additional cities will rely on regulatory considerations.
Mahindra Lifespace Acquires 13.46-Acre Land Parcel in Pune for ₹3,500 Crore Housing Project
In order to build a massive residential project with an estimated GDV gross development value of ₹3,500 crore, Mahindra Lifespace Developers Ltd., the real estate and infrastructure development division of the Mahindra Group, has acquired a 13.46-acre plot of land in Pune.
The new land is located in Nande–Mahalunge, one of Pune’s most promising growth corridors connecting Hinjewadi, Baner, and Balewadi. The acquisition reinforces Mahindra Lifespace’s focus on expanding its footprint in high-demand urban micro-markets with strong infrastructure potential.
A Strategic Location in Pune’s Western Corridor
The Nande–Mahalunge area has rapidly emerged as a real-estate hotspot in recent years, thanks to its proximity to key employment hubs such as Hinjewadi IT Park, Baner, and Balewadi High Street. It is also part of the PMRDA Town Planning Scheme, which will further enhance road networks and civic infrastructure.
Mahindra Lifespace’s new project will benefit from these infrastructural developments, offering easy access to the Mumbai–Bengaluru Expressway, Pune Metro, and proposed ring road connectivity, making it a well-connected and desirable address for future homebuyers.
₹3,500 Crore Project with Premium Residential Focus
Industry estimates suggest the development could include a mix of 2, 3 and 4 BHK configurations, following Mahindra Lifespace’s consistent approach of integrating sustainability, open spaces, and green architecture in all its projects.
A GDV of ₹3,500 crore places this among the company’s largest projects in western India, signalling strong confidence in Pune’s luxury housing demand.
The soon-to-be-completed joint survey work of the proposed Purandar Greenfield International Airport near Pune is a significant milestone toward the completion of the much-awaited project.
The government of Maharashtra wants to finish land acquisition by the end of this year, and construction tenders are likely to be invited in the first quarter of 2026. The airport is expected to be about 40 km away from Pune city and will have two parallel runways, each measuring 4,000 x 60 meters, and will be able to accommodate 75 million passengers annually. Once up and running, it is anticipated that it will cater to Pune along with western and central Maharashtra, greatly enhancing regional connectivity and economic development.
The concurrent measurement process spans seven villages reserved for the airport area: Kumbharvalan, Pargaon Memane, Khanwadi, Ekhatpur, Rajewadi, Munjwadi, and Udachiwadi. MADC officials and the district administration have been observing the process carefully in order to maintain transparency and coordination with the local villagers.
The government has noted that the compensation and rehabilitation process would be done in a fair and transparent manner to address farmers' concerns as well as ensure hassle-free implementation of the project.